Tough floors. Beautiful finish. 601-319-9619
Home About
Services Services
Systems Epoxy Flooring Metallic Epoxy Garage Epoxy Flake Epoxy Commercial Epoxy Industrial Epoxy Concrete Polishing Concrete Grinding Concrete Sealing Grind and Seal Quartz Systems Urethane Cement Patio Coatings Pool Deck Coatings
Automotive Auto Shop Epoxy Auto Detailing Epoxy Collision Shop Epoxy Vinyl Wrap Shop Epoxy Tire Shop Epoxy Car Wash Epoxy Dealership Showroom Epoxy Quick Lube Epoxy Diesel Shop Epoxy Motorcycle Shop Epoxy Powersports Dealership Epoxy Aircraft Hangar Epoxy Boat Repair Shop Epoxy
Retail Smoke Shop Epoxy Dispensary Epoxy Liquor Store Epoxy Gas Station Epoxy Grocery Store Epoxy Clothing Store Epoxy Showroom Epoxy Nightclub Epoxy Brewery Epoxy Coffee Shop Epoxy Hotel Lobby Epoxy Restaurant Epoxy
Fitness Gym Floor Epoxy CrossFit Gym Epoxy MMA Gym Epoxy Yoga Studio Epoxy Dance Studio Epoxy Indoor Sports Facility Epoxy Trampoline Park Epoxy Bowling Alley Epoxy Arcade Epoxy Locker Room Epoxy
Medical Medical Office Epoxy Dental Office Epoxy Veterinary Clinic Epoxy Pharmacy Epoxy Hospital Epoxy Cleanroom Epoxy Physical Therapy Clinic Epoxy
Industrial Warehouse Epoxy Food Processing Plant Epoxy Cold Storage Epoxy Chemical Plant Epoxy Aerospace Facility Epoxy Distribution Center Epoxy Loading Dock Epoxy
Trades Barbershop Epoxy Tattoo Shop Epoxy Nail Salon Epoxy Pet Grooming Epoxy Dog Kennel Epoxy Self Storage Epoxy Print Shop Epoxy Maker Space Epoxy
Institutional School Epoxy Daycare Epoxy Church Epoxy Community Center Epoxy
Areas Service Areas
Mississippi
Attala County, MS Attala County, MS Sand Hill, MS
Forrest County, MS Forrest County, MS Hattiesburg, MS
Greene County, MS Greene County, MS Leakesville, MS
Hancock County, MS Hancock County, MS Bay St. Louis, MS Diamondhead, MS Kiln, MS Waveland, MS
Harrison County, MS Harrison County, MS Biloxi, MS DeLisle, MS Gulfport, MS Long Beach, MS Pass Christian, MS
Hinds County, MS Hinds County, MS Byram, MS Clinton, MS Terry, MS
Jackson County, MS Jackson County, MS Big Point, MS Gautier, MS Gulf Hills, MS Gulf Park Estates, MS Latimer, MS Moss Point, MS Ocean Springs, MS Pascagoula, MS Vancleave, MS
Jones County, MS Jones County, MS Ellisville, MS Laurel, MS
Lamar County, MS Lamar County, MS Lumberton, MS Oak Grove, MS Purvis, MS
Lauderdale County, MS Lauderdale County, MS Collinsville, MS Meridian Station, MS
Madison County, MS Madison County, MS Gluckstadt, MS Madison, MS
Neshoba County, MS Neshoba County, MS Pearl River, MS
Pearl River County, MS Pearl River County, MS Picayune, MS Poplarville, MS
Rankin County, MS Rankin County, MS Brandon, MS Cleary, MS Florence, MS Flowood, MS Goshen Springs, MS Langford, MS Monterey, MS Pearl, MS Piney Woods, MS Puckett, MS Robinhood, MS
Scott County, MS Scott County, MS Sebastopol, MS
Simpson County, MS Simpson County, MS Magee, MS Mendenhall, MS
Stone County, MS Stone County, MS McHenry, MS
Walthall County, MS Walthall County, MS Tylertown, MS
Alabama
Baldwin County, AL Baldwin County, AL Foley, AL Gulf Shores, AL Orange Beach, AL Robertsdale, AL
Clarke County, AL Clarke County, AL Jackson, AL Thomasville, AL
Mobile County, AL Mobile County, AL Mobile, AL
Louisiana
St. Tammany Parish, LA St. Tammany Parish, LA Covington, LA Madisonville, LA Mandeville, LA Slidell, LA
Finishes Gallery Blog Contact Call · 601-319-9619
Skip to content

Loading Dock Epoxy

Industrial

Loading Dock Epoxy that survives the room

Dock edges and plates take constant impact. Most residential floors go down in a single day. Walk on it in 12 hours, move heavy things at 24, park on it at 48.

The edge stops crumbling.

Walk on it
12 hours
Heavy items
24 hours

What we actually install

Impact-resistant build detailed to the edge.

Every job starts the same way, with the slab itself. Pallet jacks, dock plates and weather.

Talk to us about this floor or call 601-319-9619.

How the day runs

Grind

Impact-resistant build detailed to the edge.

Build

Pallet jacks, dock plates and weather.

Cure

A day on site is the normal answer for a residential floor.

What the install actually looks like

Moisture gets tested before resin gets opened.

Preparation is the part customers never see and always pay for twice if it is skipped. We turn up with the grinder and the extraction first, and the first hour is dust and noise rather than anything that looks like progress. Impact-resistant build detailed to the edge.

Once the slab is open and clean we chase any cracks, fill them, and grind those flat. Then the primer goes down, and from that point the day is a sequence with cure windows in it rather than a job you can rush. Single day install is standard here. The waiting afterwards is just cure time.

Four names, one crew. Kevin Garner built the company in 2021 to pass it on. That matters on a loading dock epoxy job because the person who decided the spec is the person holding the squeegee, so nothing gets lost between the quote and the floor.

5.0
24 reviews
Used a lot of flooring companies over the years on various jobs and lemme tell you you’re in good hands with these guys. From the quote to the finished job they were nothing short of professional.
Verified review

The slab decides the spec.

What we find under a loading dock epoxy job

Slabs around Laurel and down toward the coast are mostly 1970s to 1990s pours, and they were finished hard. A hard-troweled surface has almost no porosity left, which is why paint peels off it in sheets. Grinding opens that surface back up so resin can key into the concrete instead of sitting on top of it.

Commercial slabs that have been in service take oil deep into the pores. Surface degreasing does not reach it, and resin will not bond through it. We grind it out, and where contamination runs deep we prime with something built to tolerate it.

The system we specify

We install Duraflex systems. The certification matters less than what it means in practice, which is that the product data is real, the cure windows are tested, and there is a manufacturer standing behind the spec rather than a generic resin bought on price.

Metallic pigment is moved by hand while the resin is still open, so no two floors are the same. That is the appeal and it also means the installer matters more than the product.

Specified from the load, not a brochure.

Load, chemistry and temperature decide everything

An industrial floor is specified from three numbers: the heaviest point load it will carry, the chemicals it will contact, and the temperature range it will cycle through. Get those right and the floor is straightforward. Guess at them and you get a floor that looks correct and fails in the one area that mattered.

Thermal shock is the one most often missed. A slab that gets hosed with hot water and then sits cold expands and contracts against a rigid coating until the bond gives up. Cementitious urethane handles that because it moves with the concrete. Standard epoxy does not, regardless of how thick it is laid.

One day install, 12 hours to walk, 48 to drive.

What we need to know before specifying

·Heaviest wheel or point load, including racking legs
·Chemical register for anything that can reach the floor
·Washdown temperature and frequency
·Whether the area can be taken out of service, and for how long

Dock edges and plates take constant impact.

Certified
Duraflex
Radius
About 100 miles

What this floor has to put up with

Pallet jacks, dock plates and weather. Impact-resistant build detailed to the edge. That combination is what we specify against, and it is why a loading dock epoxy job is quoted from the room rather than from a rate card.

The edge stops crumbling. One visit, one day, then 48 hours before the car goes back on.

Living with the floor afterwards

Maintenance is a dust mop and occasionally a neutral cleaner. No wax, no sealing, no annual reapplication. If someone tells you a coated floor needs yearly maintenance, they are describing their own product failing.

Coated floors do not need to be stripped and resealed, which is where the savings against VCT actually come from.

We work out of Laurel and cover roughly a hundred miles in every direction. That takes in Jones County, Rankin, Simpson and Lamar to the north and west, the whole Mississippi coast from Bay St. Louis through Biloxi to Pascagoula, across into Baldwin and Mobile County in Alabama, and west to St. Tammany Parish. See the areas we cover.

Questions we get asked

How long does a loading dock epoxy job take?

Most residential floors go down in a single day. Walk on it in 12 hours, move heavy things at 24, park on it at 48.

What preparation does loading dock epoxy need?

Impact-resistant build detailed to the edge. Before anything is mixed we know what the floor is sitting on.

Can it take the wear this room gets?

Pallet jacks, dock plates and weather. We specify the build thickness against the actual use, not a standard sheet.

Which areas do you cover?

Yes. We cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish, roughly a hundred miles out from Laurel.

Is it your own crew?

One crew, four names, and the founder on site. That is the whole company.

Can I see the colour before deciding?

Yes. We bring the chip deck out and you pick the blend against your own light and your own walls. Colours read differently under LED, under a skylight and under a garage door that is half open, so choosing off a photograph is how people end up disappointed.

What do you find under a floor like this?

Some floors do not need coating at all. If the slab is sound and the use is light, polishing or sealing the concrete itself is cheaper and lasts longer. We will say so.

What maintenance does it need?

Furniture and jack stands want pads under them. Point loads with sharp edges are the realistic way a residential floor gets damaged.

What am I paying for in the build?

Dark floors show dust and light floors show tyre marks. There is no colour that hides everything, and we would rather say that than sell a finish that disappoints.

Call Kevin and talk through what the floor needs.

Aaron, Kyler and Averie work with Kevin on every install. That is by design. Serving Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. See finished floors or get in touch.

Tell us what the floor is doing now. We will tell you what it takes to fix it.

601-319-9619

icmcoatingmasters@gmail.com
Laurel, MS

Family run since 2021 · Duraflex certified

© 2026 ICM Coating Masters. All rights reserved. About Finishes Gallery Reviews FAQs Contact