
Flake Epoxy done in a day
Solid colour shows every speck of dirt and every roller mark. Residential floors are usually a one day job start to finish.
Pick a blend off the deck and see it on a floor before committing.
What we actually install
Vinyl chip broadcast wet into the base, scraped back and topped, so the flake is locked not sprinkled.
The first hour on site is spent on the concrete, not the colour. The texture hides dust and gives grip when the floor is wet.
Talk to us about this floor or call 601-319-9619.

How the day runs
One day down for most homes. Commercial work is phased to your hours.
Since 2021 this has been Kevin, Aaron, Kyler and Averie. No subcontractors sent in your place.
What the install actually looks like
We test the slab before we promise a finish.
We would rather spend the morning grinding than come back in a year. We turn up with the grinder and the extraction first, and the first hour is dust and noise rather than anything that looks like progress. Vinyl chip broadcast wet into the base, scraped back and topped, so the flake is locked not sprinkled.
Once the slab is open and clean we chase any cracks, fill them, and grind those flat. Then the primer goes down, and from that point the day is a sequence with cure windows in it rather than a job you can rush. Residential floors are usually a one day job start to finish.
Kevin Garner founded ICM in 2021 wanting work he could hand down. Aaron, Kyler and Averie make that possible. That matters on a flake epoxy job because the person who decided the spec is the person holding the squeegee, so nothing gets lost between the quote and the floor.
Used a lot of flooring companies over the years on various jobs and lemme tell you you’re in good hands with these guys. From the quote to the finished job they were nothing short of professional.Verified review
Other systems floors we coat
The slab decides the spec.
What we find under a flake epoxy job
Power troweled warehouse floors are the hardest substrate we deal with. The surface is dense, sealed by the process itself, and needs aggressive metal-bond diamonds before anything will stick.
Concrete that has been under carpet or tile carries adhesive, and old adhesives vary from water soluble to essentially permanent. Identifying which one is on the floor decides whether it is a grinding job or a full removal.
The system we specify
Coving at the wall turns a floor into a sealed basin. In kitchens, kennels and wet rooms that detail is the whole point, because water stops finding the joint between floor and wall.
Quartz systems are built in layers, broadcast and troweled rather than rolled. It is slower to install and it is the toughest, grippiest thing we lay.
Specified from the load, not a brochure.
Why the system matters more than the colour
A resin floor is four products stacked in order, and each one has a job. The primer wets into the open concrete and grips. The base coat builds thickness and carries the pigment. The broadcast layer, whether that is vinyl flake or graded quartz, gives the floor its texture and most of its wear resistance. The topcoat takes the abrasion and the UV so the layers underneath never see either.
Skip a layer and the floor still looks right on day one. It fails in month eight, usually along the door line where the sun hits or in the wheel tracks where the load concentrates. That is the difference between a coating and a system, and it is not visible in a photograph.
The whole system goes down in one visit on most homes.
What we check before quoting
Solid colour shows every speck of dirt and every roller mark.
What this floor has to put up with
The texture hides dust and gives grip when the floor is wet. Vinyl chip broadcast wet into the base, scraped back and topped, so the flake is locked not sprinkled. That combination is what we specify against, and it is why a flake epoxy job is quoted from the room rather than from a rate card.
Pick a blend off the deck and see it on a floor before committing. A day on site is the normal answer for a residential floor.
Living with the floor afterwards
Rubber mats left permanently on a coated floor can mark it. Not damage, but a visible outline. If you use mats, move them occasionally.
Keep the drains clear in a wet room. Standing water is not a problem for the coating and is a problem for everything else.
From Laurel we cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish. If you are inside about a hundred miles, we will come and look at the slab. See the areas we cover.
Questions we get asked
How many days do you need on site?
Residential floors are usually a one day job start to finish.
What is the prep work here?
Vinyl chip broadcast wet into the base, scraped back and topped, so the flake is locked not sprinkled. What goes wrong with coatings almost always goes wrong underneath them.
How does it handle heavy use?
The texture hides dust and gives grip when the floor is wet. We specify the build thickness against the actual use, not a standard sheet.
How far do you travel for this?
Yes. We cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish, roughly a hundred miles out from Laurel.
Who actually does the work?
Kevin Garner founded ICM in 2021 wanting work he could hand down. Aaron, Kyler and Averie make that possible.
Can I see the colour before deciding?
Yes. We bring the chip deck out and you pick the blend against your own light and your own walls. Colours read differently under LED, under a skylight and under a garage door that is half open, so choosing off a photograph is how people end up disappointed.
What if the concrete is in bad shape?
Power troweled warehouse floors are the hardest substrate we deal with. The surface is dense, sealed by the process itself, and needs aggressive metal-bond diamonds before anything will stick.
How do I clean it?
Rubber mats left permanently on a coated floor can mark it. Not damage, but a visible outline. If you use mats, move them occasionally.
Why does this outlast a cheap coating?
Cementitious urethane costs more than epoxy and outlives it in any wet or thermally cycled room. In a brewery or a food plant it is not an upgrade, it is the correct product.
Call us and we will be straight with you about the options.
The reason quality holds is that the family name is on every job. Serving Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. See finished floors or get in touch.