Cleary hospital floors renovated without closing the building
Hospital floors rarely get redone in an empty building. The rooms next door are full, the halls are moving beds, and the air has to stay clean. We work inside containment with negative air, on the hours the facility gives us, and build a seamless floor that rises into an integral cove and seals tight around every column and penetration.
Send us the details
The hardest part of a hospital floor is everything around it: patients in the next room, staff on the other side of the plastic, and a building that never closes.
Kevin Garner founded ICM in 2021 to pass on to his family, and the floor behind your containment wall is laid by Kevin with Aaron Garner, Kyler Welch and Averie Garner, using the Duraflex systems we are certified on.
Working a renovation next to occupied rooms
Before any tool starts, the work area gets sealed off with a containment wall and a negative air machine that pulls air out of the space and exhausts it, so dust and fumes move away from the corridor instead of toward it. The facility’s own people usually inspect that setup before grinding begins. Whether the general contractor builds it or we do, it gets built to what they ask for.
Timing gets set by the facility. Grinding is loud and goes on the nights or weekends they choose, often when the rooms on either side are empty. Coating days are quieter, but the smell of fresh resin matters more near patients, so we plan low odor products where the facility wants them and make sure the negative air stays on until the coats have set.
On these jobs we work inside the general contractor’s schedule. The floor goes in after the walls, the ceiling and the med gas rough-in are done, and before equipment booms and casework go back in. Kevin sits down with the contractor and the facility early, so the cure time gets its own place on the calendar.
The hospital epoxy page covers the work itself. For this one, send over the details or call 601-319-9619.
Building a floor with nowhere for anything to hide
A seamless field
The floor goes down as one continuous surface from wall to wall, with no sheet seams, no grout and no thresholds inside the room. Every joint in the slab underneath is filled and ground flat first, so nothing telegraphs up through the coating as a ridge where cleaning solution could gather.
Cove carried up the walls
An integral cove is formed from the coating material itself and rises from the floor in a smooth curve, then the flake field runs straight into it. Floor and base become one piece, so wet mops and wipes pass over the corner instead of pushing dirt into it.
Inside a hospital, the floor work is half coating and half keeping the air where it belongs.
Sealed at every penetration
Operating rooms have columns, med gas drops, equipment mounts and floor boxes coming up through the slab, and each one is a place the floor could open. We carry the coating up to and around them and seal that joint, so there is no ring of bare concrete where fluids could work under the system.
Built for their cleaning list
Hospitals clean with strong products and they clean constantly. The clear coat is chosen once we know what environmental services actually puts on the floor, including between surgical cases, because a finish not made for those chemicals can cloud or soften. We ask for that product list before the system is final.
Where hospital floors open up and let things in
A hospital floor that fails usually fails at a line or a boundary, and the renovation itself can fail long before the floor does.

Gaps left around columns
When a coating stops short of a column or a floor box, it leaves a thin ring of raw edge that every mop pass pushes water toward. The edge lifts a little at a time and fluid gets in underneath. From the doorway the room looks finished, and the problem only shows when the edge starts to curl.
Dust that got past the plastic
A containment wall with an open seam or a negative air machine switched off early lets grinding dust into the corridor. In most buildings that means extra cleaning. In a hospital it can stop the job. Taping, pressure and the machine get checked at the start of every shift, the last one as closely as the first.
Beds and carts on a thin finish
Hospital beds, crash carts and portable equipment roll the same paths all day, often heavy and on small wheels. A thin finish shows those tracks quickly as dull lanes down the middle of the room. A full build with a hard clear coat carries that rolling weight without wearing a path into it.
Fumes drifting toward patient rooms
Fresh coatings give off odor while they cure, and in an occupied building that is a matter of patient comfort. A product picked without asking, or a negative air setup turned off at the end of a shift, sends it down the hall. Both get settled with the facility before the first coat.
Lining the floor up with the contractor and the facility
On a hospital project there are usually three calendars in play: the general contractor’s, the facility’s and ours. Ours is the one that bends. We need to know when the room is turned over to us, which hours we are allowed to grind, who signs off on containment, and what has to be back in service on which day.
The infection control side of it gets agreed before anyone mobilizes. Where the containment wall goes, which door the crew uses, how materials and waste move through the building and at what hours. Following that plan to the letter is part of the work, and it is the part the facility watches most closely.
The last step is the hand-back. Before the room goes back to the facility, Kevin walks it with the contractor and whoever signs for the space, checks every cove, seam and penetration, and marks anything that needs a touch. Those get fixed before the containment comes down, not after the first patient bed rolls in.
Where Cleary sits for us
Cleary sits in Rankin County, inside the area we serve from Laurel, and a hospital floor there gets scheduled around the facility’s own calendar.
The rest of what we coat in Cleary
Aaron and his crew did a fantastic job, friendly and professional.Verified review
Questions we get asked
Can you work while the hospital stays open?
That is the usual situation. The room gets sealed inside a containment wall with negative air pulling dust and fumes away from the corridor, and loud work runs on the hours the facility sets. The rest of the building carries on around us, and we follow the facility’s own rules for moving through it.
What is negative air?
A machine pulls air out of the sealed work area and exhausts it, so the space sits at lower pressure than the hallway outside. Any leak in the containment then draws air in instead of letting dust out. It runs through grinding and coating, and stays on until the floor has set.
How do you deal with the smell near patients?
We plan for it from the start. Products are chosen with odor in mind where the facility asks, the negative air keeps fumes moving away from occupied rooms, and coating can be booked for hours when the rooms nearby are empty. All of that gets agreed with the facility before the first coat.
What about the columns and med gas drops?
Everything that comes up through the floor gets the coating carried up to it and sealed around its base. Those edges are where a floor most often opens, so they get more attention than the open field. Tell us about anything bolted to the slab before we start, so nothing gets coated around by guesswork.
Which cleaners should we tell you about?
Every product that touches the floor, including whatever is used for terminal cleaning between cases. We choose the clear coat to match that list. A finish never meant for strong hospital chemicals can cloud or turn soft, and the product list is the one thing that heads that off.
Where does the floor fit in the contractor’s schedule?
After walls, ceilings and the rough-in for med gas and power, and before equipment and casework go back. That way the cove runs unbroken and every penetration is open to seal. We work from the general contractor’s schedule and want a seat at the early coordination meetings.
Bring Kevin in before the containment goes up
Call Kevin with the rooms, the hours you can give us and who runs infection control on the project. He will walk the space, look at the slab and the penetrations, and put a number on it that already allows for the containment and the cure.