Tough floors. Beautiful finish.
601-319-9619
Home About
Services
Systems Epoxy Flooring Metallic Epoxy Garage Epoxy Flake Epoxy Commercial Epoxy Industrial Epoxy Concrete Polishing Concrete Grinding Concrete Sealing Grind and Seal Quartz Systems Urethane Cement Patio Coatings Pool Deck Coatings
Automotive Auto Shop Epoxy Auto Detailing Epoxy Collision Shop Epoxy Vinyl Wrap Shop Epoxy Tire Shop Epoxy Car Wash Epoxy Dealership Showroom Epoxy Quick Lube Epoxy Diesel Shop Epoxy Motorcycle Shop Epoxy Powersports Dealership Epoxy Aircraft Hangar Epoxy Boat Repair Shop Epoxy
Retail Smoke Shop Epoxy Dispensary Epoxy Liquor Store Epoxy Gas Station Epoxy Grocery Store Epoxy Clothing Store Epoxy Showroom Epoxy Nightclub Epoxy Brewery Epoxy Coffee Shop Epoxy Hotel Lobby Epoxy Restaurant Epoxy
Fitness Gym Floor Epoxy CrossFit Gym Epoxy MMA Gym Epoxy Yoga Studio Epoxy Dance Studio Epoxy Indoor Sports Facility Epoxy Trampoline Park Epoxy Bowling Alley Epoxy Arcade Epoxy Locker Room Epoxy
Medical Medical Office Epoxy Dental Office Epoxy Veterinary Clinic Epoxy Pharmacy Epoxy Hospital Epoxy Cleanroom Epoxy Physical Therapy Clinic Epoxy
Industrial Warehouse Epoxy Food Processing Plant Epoxy Cold Storage Epoxy Chemical Plant Epoxy Aerospace Facility Epoxy Distribution Center Epoxy Loading Dock Epoxy
Trades Barbershop Epoxy Tattoo Shop Epoxy Nail Salon Epoxy Pet Grooming Epoxy Dog Kennel Epoxy Self Storage Epoxy Print Shop Epoxy Maker Space Epoxy
Institutional School Epoxy Daycare Epoxy Church Epoxy Community Center Epoxy
Areas Service Areas
Mississippi
Attala County, MS Attala County, MS Sand Hill, MS
Forrest County, MS Forrest County, MS Hattiesburg, MS
Greene County, MS Greene County, MS Leakesville, MS
Hancock County, MS Hancock County, MS Bay St. Louis, MS Diamondhead, MS Kiln, MS Waveland, MS
Harrison County, MS Harrison County, MS Biloxi, MS DeLisle, MS
Gulfport, MS Gulfport, MS Flake Epoxy Garage Epoxy Pool Deck Coatings Metallic Epoxy Commercial Epoxy
Long Beach, MS Pass Christian, MS
Hinds County, MS Hinds County, MS Byram, MS Clinton, MS Terry, MS
Jackson County, MS Jackson County, MS Big Point, MS Gautier, MS Gulf Hills, MS Gulf Park Estates, MS Latimer, MS Moss Point, MS Ocean Springs, MS Pascagoula, MS Vancleave, MS
Jones County, MS Jones County, MS
Ellisville, MS Ellisville, MS Garage Epoxy Patio Coatings Concrete Polishing Commercial Epoxy Metallic Epoxy
Laurel, MS
Lamar County, MS Lamar County, MS Lumberton, MS Oak Grove, MS Purvis, MS
Lauderdale County, MS Lauderdale County, MS Collinsville, MS Meridian Station, MS
Madison County, MS Madison County, MS Gluckstadt, MS Madison, MS
Neshoba County, MS Neshoba County, MS Pearl River, MS
Pearl River County, MS Pearl River County, MS Picayune, MS Poplarville, MS
Rankin County, MS Rankin County, MS
Brandon, MS Brandon, MS Restaurant Epoxy Medical Office Epoxy Industrial Epoxy Self Storage Epoxy Concrete Sealing
Cleary, MS Florence, MS Flowood, MS Goshen Springs, MS Langford, MS Monterey, MS Pearl, MS Piney Woods, MS Puckett, MS Robinhood, MS
Scott County, MS Scott County, MS Sebastopol, MS
Simpson County, MS Simpson County, MS Magee, MS Mendenhall, MS
Stone County, MS Stone County, MS McHenry, MS
Walthall County, MS Walthall County, MS Tylertown, MS
Alabama
Baldwin County, AL Baldwin County, AL Foley, AL Gulf Shores, AL Orange Beach, AL Robertsdale, AL
Clarke County, AL Clarke County, AL Jackson, AL Thomasville, AL
Mobile County, AL Mobile County, AL Mobile, AL
Louisiana
St. Tammany Parish, LA St. Tammany Parish, LA Covington, LA Madisonville, LA Mandeville, LA Slidell, LA
Finishes Gallery Blog Contact Call · 601-319-9619
Skip to content
Fitness

Dance Studio Epoxy that survives the room

Grip has to be exactly right. We agree the shutdown window first, then build the install around it.

Send us the details

Your name, a phone number and what the floor is. We call you back to talk it through.
Rather talk now? 601-319-9619

Enough grip to turn, not enough to catch.

Walk on it
12 hours
Heavy items
24 hours

What we actually install

Controlled-sheen coating tuned for slide.

We would rather spend the morning grinding than come back in a year. Pivoting, sliding, constant movement.

Talk to us about this floor or call 601-319-9619.

How the day runs

Grind

Exterior concrete has UV and thermal cycling on top of everything else. Materials that are fine indoors amber and chalk outside, so exterior work gets a UV-stable topcoat as standard.

Build

Pivoting, sliding, constant movement.

Cure

The schedule follows the room’s use: when it can be empty, and for how long.

What the install actually looks like

The first hour on site is spent on the concrete, not the color.

We open up the surface and see what we are actually dealing with. We turn up with the grinder and the extraction first, and the first hour is dust and noise rather than anything that looks like progress. Controlled-sheen coating tuned for slide.

Once the slab is open and clean we chase any cracks, fill them, and grind those flat. Then the primer goes down, and from that point the day is a sequence with cure windows in it rather than a job you can rush. Cure time sets the reopening date, and we tell you that date before we start.

Kevin Garner founded ICM in 2021 wanting work he could hand down. Aaron, Kyler and Averie make that possible. That matters on a dance studio epoxy job because the person who decided the spec is the person holding the squeegee, so nothing gets lost between the quote and the floor.

5.0
24 reviews
Aaron and his crew did a fantastic job, friendly and professional.
Verified review

The slab decides the spec.

What we find under a dance studio epoxy job

A slab that has been acid etched instead of ground has an inconsistent profile. Some areas take the coating and some do not, and you cannot tell which until it fails. We grind regardless of what was done before.

Concrete that has been under carpet or tile carries adhesive, and old adhesives vary from water soluble to essentially permanent. Identifying which one is on the floor decides whether it is a grinding job or a full removal.

The system we specify

Moisture-tolerant primers exist for a reason and cost more for a reason. On a damp slab they are the difference between a floor and a warranty claim.

Quartz systems are built in layers, broadcast and troweled rather than rolled. It is slower to install and it is the toughest, grippiest thing we lay.

Specified from the load, not a brochure.

Impact is a different problem from wear

Most floors are specified for abrasion, which is a slow surface problem. A gym floor has to survive impact, which is a sudden structural one. A dropped barbell delivers its whole energy into a few square inches, and a thin rigid coating over concrete will spall at that point no matter how hard the topcoat is.

The answer is build thickness in the drop zones and a topcoat with some flexibility rather than maximum hardness. Under matting the coating still matters, because sweat and cleaning water get under mats and sit there. A sealed non-porous floor under the mats is what stops that becoming a smell you cannot find the source of.

Bigger rooms are done in sections so part of the building can stay in use.

What we specify for training floors

·Extra build thickness through platform and rack zones
·Non-porous sealed surface under all matted areas
·Slip rating chosen for bare feet and for sweat, not just water
·Coved edges in wet areas and around showers

Grip has to be exactly right.

Since
2021
Certified
Duraflex

What this floor has to put up with

Pivoting, sliding, constant movement. Controlled-sheen coating tuned for slide. That combination is what we specify against, and it is why a dance studio epoxy job is quoted from the room rather than from a rate card.

Enough grip to turn, not enough to catch. A standard install is one day of work and two days of patience.

Living with the floor afterwards

Pressure washing exterior coated concrete is fine at sensible pressure. Holding a turbo nozzle in one place is not.

A dust mop twice a week does more for the look of a floor than any product you can buy.

We work out of Laurel and cover roughly a hundred miles in every direction. That takes in Jones County, Rankin, Simpson and Lamar to the north and west, the whole Mississippi coast from Bay St. Louis through Biloxi to Pascagoula, across into Baldwin and Mobile County in Alabama, and west to St. Tammany Parish. See the areas we cover.

Questions we get asked

Do you need the space for more than a day?

Commercial floors are scheduled around your opening hours, not ours.

What do you do before any resin goes down?

Controlled-sheen coating tuned for slide. Good floors are decided during prep, not during the pour.

Does it cope with the loads in here?

Pivoting, sliding, constant movement. We specify the build thickness against the actual use, not a standard sheet.

Is my area inside your radius?

We cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish, roughly a hundred miles out from Laurel.

Who will be in my building?

This is a family crew. Kevin founded it in 2021 and works alongside Aaron, Kyler and Averie.

Can I see the color before deciding?

Yes. We bring the chip deck out and you pick the blend against your own light and your own walls. Colors read differently under LED, under a skylight and under a garage door that is half open, so choosing off a photograph is how people end up disappointed.

Does a cracked slab rule this out?

Concrete keeps moving for years after it is poured, and it moves more near the coast where the ground is wet and sandy. That is why we detail edges and joints rather than laying one continuous rigid sheet and hoping.

How do I stop it wearing?

Keep the drains clear in a wet room. Standing water is not a problem for the coating and is a problem for everything else.

Why does the topcoat matter?

We install Duraflex systems. The certification matters less than what it means in practice, which is that the product data is real, the cure windows are tested, and there is a manufacturer standing behind the spec rather than a generic resin bought on price.

Get in touch and we will come measure it up.

Four names, one crew. Kevin Garner built the company in 2021 to pass it on. Serving Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. See finished floors or get in touch.

Tell us what the floor is doing now. We will tell you what it takes to fix it.

601-319-9619

icmcoatingmasters@gmail.com
Laurel, MS

Family run since 2021 · Duraflex certified

© 2026 ICM Coating Masters. All rights reserved. About Finishes Gallery Reviews FAQs Sports Courts Offers Refer a Friend Get a Quote Blog Contact