Tough floors. Beautiful finish. 601-319-9619
Home About
Services Services
Systems Epoxy Flooring Metallic Epoxy Garage Epoxy Flake Epoxy Commercial Epoxy Industrial Epoxy Concrete Polishing Concrete Grinding Concrete Sealing Grind and Seal Quartz Systems Urethane Cement Patio Coatings Pool Deck Coatings
Automotive Auto Shop Epoxy Auto Detailing Epoxy Collision Shop Epoxy Vinyl Wrap Shop Epoxy Tire Shop Epoxy Car Wash Epoxy Dealership Showroom Epoxy Quick Lube Epoxy Diesel Shop Epoxy Motorcycle Shop Epoxy Powersports Dealership Epoxy Aircraft Hangar Epoxy Boat Repair Shop Epoxy
Retail Smoke Shop Epoxy Dispensary Epoxy Liquor Store Epoxy Gas Station Epoxy Grocery Store Epoxy Clothing Store Epoxy Showroom Epoxy Nightclub Epoxy Brewery Epoxy Coffee Shop Epoxy Hotel Lobby Epoxy Restaurant Epoxy
Fitness Gym Floor Epoxy CrossFit Gym Epoxy MMA Gym Epoxy Yoga Studio Epoxy Dance Studio Epoxy Indoor Sports Facility Epoxy Trampoline Park Epoxy Bowling Alley Epoxy Arcade Epoxy Locker Room Epoxy
Medical Medical Office Epoxy Dental Office Epoxy Veterinary Clinic Epoxy Pharmacy Epoxy Hospital Epoxy Cleanroom Epoxy Physical Therapy Clinic Epoxy
Industrial Warehouse Epoxy Food Processing Plant Epoxy Cold Storage Epoxy Chemical Plant Epoxy Aerospace Facility Epoxy Distribution Center Epoxy Loading Dock Epoxy
Trades Barbershop Epoxy Tattoo Shop Epoxy Nail Salon Epoxy Pet Grooming Epoxy Dog Kennel Epoxy Self Storage Epoxy Print Shop Epoxy Maker Space Epoxy
Institutional School Epoxy Daycare Epoxy Church Epoxy Community Center Epoxy
Areas Service Areas
Mississippi
Attala County, MS Attala County, MS Sand Hill, MS
Forrest County, MS Forrest County, MS Hattiesburg, MS
Greene County, MS Greene County, MS Leakesville, MS
Hancock County, MS Hancock County, MS Bay St. Louis, MS Diamondhead, MS Kiln, MS Waveland, MS
Harrison County, MS Harrison County, MS Biloxi, MS DeLisle, MS Gulfport, MS Long Beach, MS Pass Christian, MS
Hinds County, MS Hinds County, MS Byram, MS Clinton, MS Terry, MS
Jackson County, MS Jackson County, MS Big Point, MS Gautier, MS Gulf Hills, MS Gulf Park Estates, MS Latimer, MS Moss Point, MS Ocean Springs, MS Pascagoula, MS Vancleave, MS
Jones County, MS Jones County, MS Ellisville, MS Laurel, MS
Lamar County, MS Lamar County, MS Lumberton, MS Oak Grove, MS Purvis, MS
Lauderdale County, MS Lauderdale County, MS Collinsville, MS Meridian Station, MS
Madison County, MS Madison County, MS Gluckstadt, MS Madison, MS
Neshoba County, MS Neshoba County, MS Pearl River, MS
Pearl River County, MS Pearl River County, MS Picayune, MS Poplarville, MS
Rankin County, MS Rankin County, MS Brandon, MS Cleary, MS Florence, MS Flowood, MS Goshen Springs, MS Langford, MS Monterey, MS Pearl, MS Piney Woods, MS Puckett, MS Robinhood, MS
Scott County, MS Scott County, MS Sebastopol, MS
Simpson County, MS Simpson County, MS Magee, MS Mendenhall, MS
Stone County, MS Stone County, MS McHenry, MS
Walthall County, MS Walthall County, MS Tylertown, MS
Alabama
Baldwin County, AL Baldwin County, AL Foley, AL Gulf Shores, AL Orange Beach, AL Robertsdale, AL
Clarke County, AL Clarke County, AL Jackson, AL Thomasville, AL
Mobile County, AL Mobile County, AL Mobile, AL
Louisiana
St. Tammany Parish, LA St. Tammany Parish, LA Covington, LA Madisonville, LA Mandeville, LA Slidell, LA
Finishes Gallery Blog Contact Call · 601-319-9619
Skip to content

Langford, MS

Grey flake garage floor seen from the driveway with the door raised and green painted walls
Rankin County

Langford floor coatings, done in a day

The fastest growing part of the Jackson metro, which means a steady supply of new slabs and new garages. We are in and out in a day on most garages, then the floor cures.

Rankin County, MS

Floors we coat around Langford

The fastest growing part of the Jackson metro, which means a steady supply of new slabs and new garages.

New pours need to cure before they are coated, and the wait is longer than most people expect. Coating green concrete traps water under the film. We would rather push the date than come back to a blistered floor.

What a Langford job usually involves

Since
2021
Certified
Duraflex
Radius
About 100 miles
Walk on it
12 hours

A fair amount of our work around here starts as a phone call about dust. Unsealed concrete sheds fine powder constantly, it gets into everything stored in the garage, and no amount of sweeping fixes it because the floor itself is the source.

One visit, one day, then 48 hours before the car goes back on.

Driveway aprons are worth mentioning because they are a separate pour from the garage slab and they move independently. The transition between them gets detailed deliberately rather than coated straight across.

The honest answer for most homes in this area is that it is a one day job on a sound slab, and the only thing that changes that is what we find when we start grinding.

The slab decides the spec.

Before we quote anything

Commercial slabs that have been in service take oil deep into the pores. Surface degreasing does not reach it, and resin will not bond through it. We grind it out, and where contamination runs deep we prime with something built to tolerate it.

Primers, base, broadcast and topcoat are four separate products that have to be compatible. Mixing brands across layers is how delamination happens.

Living with it afterwards

Keep grit off it and a coated floor lasts. Grit under a tyre or a boot is abrasive, and abrasion is the only thing that genuinely wears a good topcoat.

Snow and road salt tracked in should be rinsed off rather than left to dry. Salt is more aggressive to the concrete than to the coating.

Commercial work around Langford

A lot of the calls we take start with somebody having tried a big-box garage floor kit. Those sit on top of sealed concrete and peel, and the removal is more work than the original job would have been.

Pool surrounds are seasonal work here. The concrete gets hot underfoot and slick when wet, and a textured coating with a cooler pigment fixes both.

The full roster runs to seventy five different rooms, from garages through to food plants and clean rooms. It is all on the services page.

Why the prep matters more than the colour

New pours need to cure before they are coated, and the wait is longer than most people expect. Coating green concrete traps water under the film. We would rather push the date than come back to a blistered floor.

Slabs around Laurel and down toward the coast are mostly 1970s to 1990s pours, and they were finished hard. A hard-troweled surface has almost no porosity left, which is why paint peels off it in sheets. Grinding opens that surface back up so resin can key into the concrete instead of sitting on top of it.

Slip resistance comes from profile, not from an additive stirred in at the end. Where a floor will be wet we build the texture in with graded aggregate and we tell you how it will feel underfoot.

Grinding is most of the job.

Drive on it
48 hours
Typical install
One day

Getting to you

Laurel is home, and from here we reach Hattiesburg, Jackson, the Gulf Coast, coastal Alabama and the north shore of Lake Pontchartrain comfortably. Coast jobs and Baldwin County work are a normal week for us.

Langford sits in Rankin County. See the other towns we cover on the Rankin County page or the full service areas list.

5.0
24 reviews
Aaron and his crew did a fantastic job, friendly and professional.
Verified review

How the day runs

Moisture gets tested before resin gets opened. We arrive with the grinder and the dust extraction, and the first stretch is noise and containment rather than anything that looks like progress. Getting the slab open and clean is what the rest of the day depends on.

Cracks get chased out and filled, high spots come down, and any old coating comes off rather than getting buried. Then the primer goes on and the day becomes a sequence with cure windows in it. Single day turnaround on typical residential slabs.

Since 2021 this has been Kevin, Aaron, Kyler and Averie. No subcontractors sent in your place. Nothing gets lost between the quote and the floor because it is the same people doing both.

Maintenance is a dust mop and occasionally a neutral cleaner. No wax, no sealing, no annual reapplication. If someone tells you a coated floor needs yearly maintenance, they are describing their own product failing. If you want to see blends first, the chip deck comes to you, and there are finished floors on the gallery page.

Langford questions

Do you cover Langford?

Yes. We are based in Laurel and Langford is inside our normal working radius.

How long does a garage take?

A typical garage is a one day install. You are walking on it that evening.

What is the slab likely to need?

The fastest growing part of the Jackson metro, which means a steady supply of new slabs and new garages. A slab that has been acid etched instead of ground has an inconsistent profile. Some areas take the coating and some do not, and you cannot tell which until it fails. We grind regardless of what was done before.

Can you match a colour?

Yes. The chip deck comes to you so you choose against your own light.

Do you do commercial work here?

Yes. Shops, kitchens, clinics and warehouses across Rankin County.

How do I get a quote?

Call 601-319-9619 and describe the room, or send the details and we will come look at the slab.

Ring the shop and we will tell you honestly what it takes.

This is a family crew. Kevin founded it in 2021 and works alongside Aaron, Kyler and Averie. Covering Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. Send us the details or see finished floors.

Tell us what the floor is doing now. We will tell you what it takes to fix it.

601-319-9619

icmcoatingmasters@gmail.com
Laurel, MS

Family run since 2021 · Duraflex certified

© 2026 ICM Coating Masters. All rights reserved. About Finishes Gallery Reviews FAQs Contact