Trampoline Park Epoxy that survives the room
Constant impact around the frames. Most of our residential installs are complete within a single working day.
Holds up at the edges where parks fail.
What we actually install
Impact-tolerant build detailed to the steel.
First we make the slab ready, then the finish is the easy part. Heavy child traffic and frame loads.
Talk to us about this floor or call 601-319-9619.
How the day runs
Grind
Impact-tolerant build detailed to the steel.
Build
Heavy child traffic and frame loads.
Cure
One day, one crew, then cure time does the rest.
What the install actually looks like
What goes wrong with coatings almost always goes wrong underneath them.
No two slabs in Jones County behave the same way. We turn up with the grinder and the extraction first, and the first hour is dust and noise rather than anything that looks like progress. Impact-tolerant build detailed to the steel.
Once the slab is open and clean we chase any cracks, fill them, and grind those flat. Then the primer goes down, and from that point the day is a sequence with cure windows in it rather than a job you can rush. One day install, 12 hours to walk, 48 to drive.
Aaron, Kyler and Averie work with Kevin on every install. That is by design. That matters on a trampoline park epoxy job because the person who decided the spec is the person holding the squeegee, so nothing gets lost between the quote and the floor.
Used a lot of flooring companies over the years on various jobs and lemme tell you you’re in good hands with these guys. From the quote to the finished job they were nothing short of professional.Verified review
Other fitness floors we coat
The slab decides the spec.
What we find under a trampoline park epoxy job
Moisture, contamination and surface profile are the three things that decide whether a floor lasts. Colour is the easy part and the only part most people ask about.
Concrete keeps moving for years after it is poured, and it moves more near the coast where the ground is wet and sandy. That is why we detail edges and joints rather than laying one continuous rigid sheet and hoping.
The system we specify
Everything we install is a system that has been tested as a system. That is the practical value of working to a manufacturer spec instead of improvising.
Slip resistance comes from profile, not from an additive stirred in at the end. Where a floor will be wet we build the texture in with graded aggregate and we tell you how it will feel underfoot.
Specified from the load, not a brochure.
Impact is a different problem from wear
Most floors are specified for abrasion, which is a slow surface problem. A gym floor has to survive impact, which is a sudden structural one. A dropped barbell delivers its whole energy into a few square inches, and a thin rigid coating over concrete will spall at that point no matter how hard the topcoat is.
The answer is build thickness in the drop zones and a topcoat with some flexibility rather than maximum hardness. Under matting the coating still matters, because sweat and cleaning water get under mats and sit there. A sealed non-porous floor under the mats is what stops that becoming a smell you cannot find the source of.
We are in and out in a day on most garages, then the floor cures.
What we specify for training floors
Constant impact around the frames.
What this floor has to put up with
Heavy child traffic and frame loads. Impact-tolerant build detailed to the steel. That combination is what we specify against, and it is why a trampoline park epoxy job is quoted from the room rather than from a rate card.
Holds up at the edges where parks fail. A standard install is one day of work and two days of patience.
Living with the floor afterwards
The honest maintenance answer is that there is almost none, and that is most of why people choose it.
A dust mop twice a week does more for the look of a floor than any product you can buy.
From Laurel we cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish. If you are inside about a hundred miles, we will come and look at the slab. See the areas we cover.
Questions we get asked
Do you need the space for more than a day?
Most of our residential installs are complete within a single working day.
What do you do before any resin goes down?
Impact-tolerant build detailed to the steel. The honest answer about a floor comes from grinding a patch of it.
Does it cope with the loads in here?
Heavy child traffic and frame loads. We specify the build thickness against the actual use, not a standard sheet.
Is my area inside your radius?
Yes. We cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish, roughly a hundred miles out from Laurel.
Who will be in my building?
A family operation out of Laurel, running since 2021.
Can I see the colour before deciding?
Yes. We bring the chip deck out and you pick the blend against your own light and your own walls. Colours read differently under LED, under a skylight and under a garage door that is half open, so choosing off a photograph is how people end up disappointed.
Does a cracked slab rule this out?
Salt is the quiet problem on coast jobs. It comes in on tyres, soaks into unsealed concrete, and sits there pushing back out. Grinding removes the loaded surface layer so the new floor is not fighting it from day one.
How do I stop it wearing?
Coated floors do not need to be stripped and resealed, which is where the savings against VCT actually come from.
Why does the topcoat matter?
Epoxy is the body of the system and polyaspartic is the armour. The epoxy bonds and builds thickness, the topcoat takes the abrasion and the UV. Using one without the other is where most cheap floors go wrong.
Talk it through with the people who will do the work.
This company exists to be passed down, which changes how carefully you work. Serving Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. See finished floors or get in touch.