Tough floors. Beautiful finish. 601-319-9619
Home About
Services Services
Systems Epoxy Flooring Metallic Epoxy Garage Epoxy Flake Epoxy Commercial Epoxy Industrial Epoxy Concrete Polishing Concrete Grinding Concrete Sealing Grind and Seal Quartz Systems Urethane Cement Patio Coatings Pool Deck Coatings
Automotive Auto Shop Epoxy Auto Detailing Epoxy Collision Shop Epoxy Vinyl Wrap Shop Epoxy Tire Shop Epoxy Car Wash Epoxy Dealership Showroom Epoxy Quick Lube Epoxy Diesel Shop Epoxy Motorcycle Shop Epoxy Powersports Dealership Epoxy Aircraft Hangar Epoxy Boat Repair Shop Epoxy
Retail Smoke Shop Epoxy Dispensary Epoxy Liquor Store Epoxy Gas Station Epoxy Grocery Store Epoxy Clothing Store Epoxy Showroom Epoxy Nightclub Epoxy Brewery Epoxy Coffee Shop Epoxy Hotel Lobby Epoxy Restaurant Epoxy
Fitness Gym Floor Epoxy CrossFit Gym Epoxy MMA Gym Epoxy Yoga Studio Epoxy Dance Studio Epoxy Indoor Sports Facility Epoxy Trampoline Park Epoxy Bowling Alley Epoxy Arcade Epoxy Locker Room Epoxy
Medical Medical Office Epoxy Dental Office Epoxy Veterinary Clinic Epoxy Pharmacy Epoxy Hospital Epoxy Cleanroom Epoxy Physical Therapy Clinic Epoxy
Industrial Warehouse Epoxy Food Processing Plant Epoxy Cold Storage Epoxy Chemical Plant Epoxy Aerospace Facility Epoxy Distribution Center Epoxy Loading Dock Epoxy
Trades Barbershop Epoxy Tattoo Shop Epoxy Nail Salon Epoxy Pet Grooming Epoxy Dog Kennel Epoxy Self Storage Epoxy Print Shop Epoxy Maker Space Epoxy
Institutional School Epoxy Daycare Epoxy Church Epoxy Community Center Epoxy
Areas Service Areas
Mississippi
Attala County, MS Attala County, MS Sand Hill, MS
Forrest County, MS Forrest County, MS Hattiesburg, MS
Greene County, MS Greene County, MS Leakesville, MS
Hancock County, MS Hancock County, MS Bay St. Louis, MS Diamondhead, MS Kiln, MS Waveland, MS
Harrison County, MS Harrison County, MS Biloxi, MS DeLisle, MS Gulfport, MS Long Beach, MS Pass Christian, MS
Hinds County, MS Hinds County, MS Byram, MS Clinton, MS Terry, MS
Jackson County, MS Jackson County, MS Big Point, MS Gautier, MS Gulf Hills, MS Gulf Park Estates, MS Latimer, MS Moss Point, MS Ocean Springs, MS Pascagoula, MS Vancleave, MS
Jones County, MS Jones County, MS Ellisville, MS Laurel, MS
Lamar County, MS Lamar County, MS Lumberton, MS Oak Grove, MS Purvis, MS
Lauderdale County, MS Lauderdale County, MS Collinsville, MS Meridian Station, MS
Madison County, MS Madison County, MS Gluckstadt, MS Madison, MS
Neshoba County, MS Neshoba County, MS Pearl River, MS
Pearl River County, MS Pearl River County, MS Picayune, MS Poplarville, MS
Rankin County, MS Rankin County, MS Brandon, MS Cleary, MS Florence, MS Flowood, MS Goshen Springs, MS Langford, MS Monterey, MS Pearl, MS Piney Woods, MS Puckett, MS Robinhood, MS
Scott County, MS Scott County, MS Sebastopol, MS
Simpson County, MS Simpson County, MS Magee, MS Mendenhall, MS
Stone County, MS Stone County, MS McHenry, MS
Walthall County, MS Walthall County, MS Tylertown, MS
Alabama
Baldwin County, AL Baldwin County, AL Foley, AL Gulf Shores, AL Orange Beach, AL Robertsdale, AL
Clarke County, AL Clarke County, AL Jackson, AL Thomasville, AL
Mobile County, AL Mobile County, AL Mobile, AL
Louisiana
St. Tammany Parish, LA St. Tammany Parish, LA Covington, LA Madisonville, LA Mandeville, LA Slidell, LA
Finishes Gallery Blog Contact Call · 601-319-9619
Skip to content

Pool Deck Coatings

Blue-grey flake coating on a covered porch floor with a wooden rail and lawn beyond
Systems

Pool Deck Coatings done in a day

Pool surrounds get hot underfoot and slick when wet. Most residential floors go down in a single day. Walk on it in 12 hours, move heavy things at 24, park on it at 48.

Grip and comfort, not just a colour change.

Rating
5.0 from 24 reviews
Since
2021

What we actually install

Textured coating with a cooler pigment, chlorine tolerant and detailed to the coping.

Every job starts the same way, with the slab itself. Bare feet, sunscreen, chlorine and constant wetting.

Talk to us about this floor or call 601-319-9619.

How the day runs

Grind

Textured coating with a cooler pigment, chlorine tolerant and detailed to the coping.

Build

Bare feet, sunscreen, chlorine and constant wetting.

Cure

You lose the garage for a day, not a week.

What the install actually looks like

Preparation is the part customers never see and always pay for twice if it is skipped.

We open up the surface and see what we are actually dealing with. We turn up with the grinder and the extraction first, and the first hour is dust and noise rather than anything that looks like progress. Textured coating with a cooler pigment, chlorine tolerant and detailed to the coping.

Once the slab is open and clean we chase any cracks, fill them, and grind those flat. Then the primer goes down, and from that point the day is a sequence with cure windows in it rather than a job you can rush. One day install, 12 hours to walk, 48 to drive.

A family operation out of Laurel, running since 2021. That matters on a pool deck coatings job because the person who decided the spec is the person holding the squeegee, so nothing gets lost between the quote and the floor.

5.0
24 reviews
Aaron and his crew did a fantastic job, friendly and professional.
Verified review

The slab decides the spec.

What we find under a pool deck coatings job

Slabs around Laurel and down toward the coast are mostly 1970s to 1990s pours, and they were finished hard. A hard-troweled surface has almost no porosity left, which is why paint peels off it in sheets. Grinding opens that surface back up so resin can key into the concrete instead of sitting on top of it.

Concrete keeps moving for years after it is poured, and it moves more near the coast where the ground is wet and sandy. That is why we detail edges and joints rather than laying one continuous rigid sheet and hoping.

The system we specify

We install Duraflex systems. The certification matters less than what it means in practice, which is that the product data is real, the cure windows are tested, and there is a manufacturer standing behind the spec rather than a generic resin bought on price.

Quartz systems are built in layers, broadcast and troweled rather than rolled. It is slower to install and it is the toughest, grippiest thing we lay.

Specified from the load, not a brochure.

Why the system matters more than the colour

A resin floor is four products stacked in order, and each one has a job. The primer wets into the open concrete and grips. The base coat builds thickness and carries the pigment. The broadcast layer, whether that is vinyl flake or graded quartz, gives the floor its texture and most of its wear resistance. The topcoat takes the abrasion and the UV so the layers underneath never see either.

Skip a layer and the floor still looks right on day one. It fails in month eight, usually along the door line where the sun hits or in the wheel tracks where the load concentrates. That is the difference between a coating and a system, and it is not visible in a photograph.

We are in and out in a day on most garages, then the floor cures.

What we check before quoting

·Moisture content of the slab, measured not guessed
·Surface profile after a test grind in an inconspicuous corner
·Existing coatings or adhesives and how deep they go
·Crack and joint movement, and whether the joints are still working

Pool surrounds get hot underfoot and slick when wet.

Heavy items
24 hours
Drive on it
48 hours

What this floor has to put up with

Bare feet, sunscreen, chlorine and constant wetting. Textured coating with a cooler pigment, chlorine tolerant and detailed to the coping. That combination is what we specify against, and it is why a pool deck coatings job is quoted from the room rather than from a rate card.

Grip and comfort, not just a colour change. A standard install is one day of work and two days of patience.

Living with the floor afterwards

Maintenance is a dust mop and occasionally a neutral cleaner. No wax, no sealing, no annual reapplication. If someone tells you a coated floor needs yearly maintenance, they are describing their own product failing.

Hot tyre pickup is a failure mode of cheap coatings, not of a properly installed flake and polyaspartic build. You can park on it hot without lifting the finish.

We work out of Laurel and cover roughly a hundred miles in every direction. That takes in Jones County, Rankin, Simpson and Lamar to the north and west, the whole Mississippi coast from Bay St. Louis through Biloxi to Pascagoula, across into Baldwin and Mobile County in Alabama, and west to St. Tammany Parish. See the areas we cover.

Questions we get asked

How many days do you need on site?

Most residential floors go down in a single day. Walk on it in 12 hours, move heavy things at 24, park on it at 48.

What is the prep work here?

Textured coating with a cooler pigment, chlorine tolerant and detailed to the coping. Concrete varies street to street around here, so we check.

How does it handle heavy use?

Bare feet, sunscreen, chlorine and constant wetting. We specify the build thickness against the actual use, not a standard sheet.

How far do you travel for this?

Yes. We cover south Mississippi, the coast, coastal Alabama and St. Tammany Parish, roughly a hundred miles out from Laurel.

Who actually does the work?

This is a family crew. Kevin founded it in 2021 and works alongside Aaron, Kyler and Averie.

Can I see the colour before deciding?

Yes. We bring the chip deck out and you pick the blend against your own light and your own walls. Colours read differently under LED, under a skylight and under a garage door that is half open, so choosing off a photograph is how people end up disappointed.

What if the concrete is in bad shape?

Basement and below-grade slabs are damp by default. A coating that works in a garage will not necessarily hold down there, so those rooms get a system chosen for moisture rather than for looks.

How do I clean it?

Pressure washing exterior coated concrete is fine at sensible pressure. Holding a turbo nozzle in one place is not.

Why does this outlast a cheap coating?

Slip resistance comes from profile, not from an additive stirred in at the end. Where a floor will be wet we build the texture in with graded aggregate and we tell you how it will feel underfoot.

Call Kevin and talk through what the floor needs.

This company exists to be passed down, which changes how carefully you work. Serving Laurel and south Mississippi, the Gulf Coast, coastal Alabama and St. Tammany Parish. See finished floors or get in touch.

Tell us what the floor is doing now. We will tell you what it takes to fix it.

601-319-9619

icmcoatingmasters@gmail.com
Laurel, MS

Family run since 2021 · Duraflex certified

© 2026 ICM Coating Masters. All rights reserved. About Finishes Gallery Reviews FAQs Contact